Abstract
The purpose of this paper is to solve the Maintenance Cost Leveling Problem in an electric power system, which means to level annual maintenance cost for a fixed period. An ideal maintenance model is defined to solve the problem. The model is the hierarchical maintenance model with two sheaves, the equipment maintenance model and the company maintenance model. The models can explain the maintenance operations in detail and make clear the maintenance structure in the problem. The problem is divided two optimization sub-problems with a hierarchical relation by using the models. The hierarchal optimization problems can be solved approximately. This paper will show that the ideal maintenance model is effective through solving the problem.
Original language | English |
---|---|
Title of host publication | IET Conference Publications |
Publisher | Institution of Engineering and Technology |
Volume | 2012 |
Edition | 616 CP |
ISBN (Print) | 9781849197434 |
DOIs | |
Publication status | Published - 2012 |
Event | 9th IET International Conference on Advances in Power System Control, Operation and Management, APSCOM 2012 - Hong Kong Duration: 2012 Nov 18 → 2012 Nov 21 |
Other
Other | 9th IET International Conference on Advances in Power System Control, Operation and Management, APSCOM 2012 |
---|---|
City | Hong Kong |
Period | 12/11/18 → 12/11/21 |
Keywords
- Condition based maintenance
- Cost leveling
- Hierarchical model
- Maintenance
- Multi-objective optimization
- Partially observable Markov decision processes
- Reliability based maintenance
- Semi-Markov decision processes
ASJC Scopus subject areas
- Electrical and Electronic Engineering