Abstract
We model for 'Naiji System' which is a unique corporation technique between a manufacturer and suppliers in Japan. We propose a two stage solution procedure for a production planning problem with advance demand information, which is called 'Naiji'. Under demand uncertainty, this model is formulated as a nonlinear stochastic programming problem which minimizes the sum of production cost and inventory holding cost subject to a probabilistic constraint and some linear production constraints. By the convexity and the special structure of correlation matrix in the problem where inventory for different periods is not independent, we propose a solution procedure with two stages which are named Mass Customization Production Planning & Management System (MCPS) and Variable Mesh Neighborhood Search (VMNS) based on meta-heuristics. It is shown that the proposed solution procedure is available to get a near optimal solution efficiently and practical for making a good master production schedule in the suppliers.
Original language | English |
---|---|
Pages (from-to) | 633-646 |
Number of pages | 14 |
Journal | Journal of Advanced Mechanical Design, Systems and Manufacturing |
Volume | 6 |
Issue number | 5 |
DOIs | |
Publication status | Published - 2012 |
Externally published | Yes |
Keywords
- Advance demand information
- Corporation
- Correlation matrix
- Inventory
- Meta-heuristics
- Production planning
- Stochastic programming
ASJC Scopus subject areas
- Mechanical Engineering
- Industrial and Manufacturing Engineering