Evaluation of voltage control effect of acquisition period for IT switch Data

Tsuyoshi Udagawa*, Yasuhiro Hayashi, Naoyuki Takahashi, Yasuo Matsuura, Tomohiko Morita, Masahiro Minami

*Corresponding author for this work

Research output: Contribution to journalArticlepeer-review

10 Citations (Scopus)

Abstract

Measured data from IT switches are utilized in order to control voltage in distribution systems with photovoltaic generation systems. However, length of period from the data measurement to the data acquisition from IT switches affects voltage control ability in the distribution automation system. In this paper, a voltage control method by LRT and SVR with the periodic data from IT switches is proposed, and using the method, the effect of the length of the data acquisition period for voltage control is evaluated through numerical simulations in a distribution system model. Furthermore, the optimal length of the data acquisition period is determined according to PV penetration rate.

Original languageEnglish
Pages (from-to)324-332
Number of pages9
JournalIEEJ Transactions on Power and Energy
Volume133
Issue number4
DOIs
Publication statusPublished - 2013

Keywords

  • Distribution system
  • IT switch
  • LRT
  • Period
  • SVR
  • Voltage control

ASJC Scopus subject areas

  • Energy Engineering and Power Technology
  • Electrical and Electronic Engineering

Fingerprint

Dive into the research topics of 'Evaluation of voltage control effect of acquisition period for IT switch Data'. Together they form a unique fingerprint.

Cite this