Abstract
Unscheduled disruptions often occur in the actual manufacturing systems. A systematic scheduling method is therefore required to modify and improve the initial production schedule in order to cope with the unexpected disturbances. The previous researches proposed the Genetic Algorithm based reactive scheduling method that improves the initial production schedule without interrupting the manufacturing processes. This research proposes a new crossover method based on the dominance of gene in order to modify the production schedule faster than the previous method.
Original language | English |
---|---|
Pages | 427-432 |
Number of pages | 6 |
Publication status | Published - 2005 |
Externally published | Yes |
Event | 3rd International Conference on Leading Edge Manufacturing in 21st Century, LEM 2005 - Nagoya, Japan Duration: 2005 Oct 19 → 2005 Oct 22 |
Other
Other | 3rd International Conference on Leading Edge Manufacturing in 21st Century, LEM 2005 |
---|---|
Country/Territory | Japan |
City | Nagoya |
Period | 05/10/19 → 05/10/22 |
Keywords
- Crossover
- Genetic algorithm
- Reactive scheduling
- Total flow time
- Total tardiness
ASJC Scopus subject areas
- Industrial and Manufacturing Engineering