TY - JOUR
T1 - Test results of a 30 m HTS cable for Yokohama project
AU - Masuda, T.
AU - Yumura, H.
AU - Ohya, M.
AU - Ashibe, Y.
AU - Watanabe, M.
AU - Minamino, T.
AU - Ito, H.
AU - Honjo, S.
AU - Mimura, T.
AU - Kitoh, Y.
AU - Noguchi, Y.
N1 - Funding Information:
A new HTS cable project supported by Ministry of Economy, Trade and Industry (METI) and New Energy and Industrial Technology Development Organization (NEDO) has started in Japan since 2007. Target of this project is to operate a 66 kV, 200 MVA HTS cable in the real grid in order to demonstrate its reliability and stable operation [1], [2].
Funding Information:
Manuscript received August 02, 2010; accepted October 14, 2010. Date of publication December 23, 2010; date of current version May 27, 2011. This work was supported in part by the Japanese Ministry of Economy, Trade and Industry (METI) and the New Energy and Industrial Technology Development Organization (NEDO).
PY - 2011/6
Y1 - 2011/6
N2 - HTS cable demonstration project supported by Ministry of Economy, Trade and Industry (METI) and New Energy and Industrial Technology Development Organization (NEDO) has started in Japan. The target of this project is to operate a 66 kV, 200 MVA HTS cable in the live network of Tokyo Electric Power Company in order to demonstrate its reliability and stable operation. The design of the HTS cable with DI-BSCCO has been completed as wellas thoseof atermination and a joint. A 30-meter HTS cable system with terminations, a joint and a cooling system was installed in SEI facility to confirm their design and performance. Various tests as voltage tests, nominal and over current tests, heat cycle tests, heat loss measurements and so on were conducted and it is verified that the cable has good performances as design. This paper describes the design and test results of a 30-meter HTS cable, and discusses required test items of HTS cables.
AB - HTS cable demonstration project supported by Ministry of Economy, Trade and Industry (METI) and New Energy and Industrial Technology Development Organization (NEDO) has started in Japan. The target of this project is to operate a 66 kV, 200 MVA HTS cable in the live network of Tokyo Electric Power Company in order to demonstrate its reliability and stable operation. The design of the HTS cable with DI-BSCCO has been completed as wellas thoseof atermination and a joint. A 30-meter HTS cable system with terminations, a joint and a cooling system was installed in SEI facility to confirm their design and performance. Various tests as voltage tests, nominal and over current tests, heat cycle tests, heat loss measurements and so on were conducted and it is verified that the cable has good performances as design. This paper describes the design and test results of a 30-meter HTS cable, and discusses required test items of HTS cables.
KW - Fault current
KW - High-temperature superconductors
KW - Power cable installation
KW - Superconducting cables
UR - http://www.scopus.com/inward/record.url?scp=79957895868&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=79957895868&partnerID=8YFLogxK
U2 - 10.1109/TASC.2010.2093109
DO - 10.1109/TASC.2010.2093109
M3 - Article
AN - SCOPUS:79957895868
SN - 1051-8223
VL - 21
SP - 1030
EP - 1033
JO - IEEE Transactions on Applied Superconductivity
JF - IEEE Transactions on Applied Superconductivity
IS - 3 PART 2
M1 - 5675727