T1 - Transmission Adequacy for Renewable Energy
T2 - 9th International Conference on Renewable Energy Research and Applications, ICRERA 2020
AU - Tatsuma, Momoko
AU - Takamori, Hiroshi
AU - Iwamura, Kazuaki
AU - Nakanishi, Yosuke
N1 - Funding Information:
ACKNOWLEDGMENT This research has been supported by JST SICORP Grant Number JPMJSC17E1.
Publisher Copyright:
© 2020 IEEE.
PY - 2020/9/27
Y1 - 2020/9/27
N2 - This paper evaluates the adequacy of a transmission network interconnecting a set of economic area nodes. Within an economic area, it is assumed that there is a pooled market for electrical energy exchange. In developing renewable resources, an existing transmission system might need reinforcement to facilitate interregional utilization. For this purpose, this paper constructs a general model to address the transmission expansion-planning problem. The model aims to improve social benefits.
AB - This paper evaluates the adequacy of a transmission network interconnecting a set of economic area nodes. Within an economic area, it is assumed that there is a pooled market for electrical energy exchange. In developing renewable resources, an existing transmission system might need reinforcement to facilitate interregional utilization. For this purpose, this paper constructs a general model to address the transmission expansion-planning problem. The model aims to improve social benefits.
KW - congestion cost
KW - congestion surplus
KW - local marginal price
KW - renewable resources
KW - transmission expansion
UR - http://www.scopus.com/inward/record.url?scp=85096769192&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=85096769192&partnerID=8YFLogxK
U2 - 10.1109/ICRERA49962.2020.9242694
DO - 10.1109/ICRERA49962.2020.9242694
M3 - Conference contribution
AN - SCOPUS:85096769192
T3 - 9th International Conference on Renewable Energy Research and Applications, ICRERA 2020
SP - 461
EP - 466
BT - 9th International Conference on Renewable Energy Research and Applications, ICRERA 2020
PB - Institute of Electrical and Electronics Engineers Inc.
Y2 - 27 September 2020 through 30 September 2020
ER -