TY - GEN
T1 - A new scheduling system with assumption-based inference
AU - Mishima, Y.
AU - Ogai, H.
AU - Ishizaki, K.
AU - Shinkura, K.
PY - 1990
Y1 - 1990
N2 - An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.
AB - An assumption-based inference system for solving scheduling problems in the steel-making process is proposed. Scheduling problems that are difficult to solve by an analytical method have been mainly solved by searching state space. However, the cost of solving the state-space problem is expensive. An assumption-based inference system that make it possible to search state space effectively and avoid combinational explosion by the pair coils exchange method was developed. To evaluate the approach, the system was applied to a steel production line for prototype use. It was confirmed that this system improved product quality.
UR - http://www.scopus.com/inward/record.url?scp=0025576592&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=0025576592&partnerID=8YFLogxK
M3 - Conference contribution
AN - SCOPUS:0025576592
SN - 0879426004
T3 - IECON Proceedings (Industrial Electronics Conference)
SP - 1298
EP - 1302
BT - Power Electronics Emerging Technologies
PB - Publ by IEEE
T2 - 16th Annual Conference of IEEE Industrial Electronics Society - IECON'90
Y2 - 27 November 1990 through 30 November 1990
ER -