抄録
In the deregulated environment, in order to sustain a regional electricity business, transmission restructuring is necessary. In transmission construction, the system stability, environmental problems and the economy must all be considered. Therefore, the purpose of this paper is to propose a new transmission planning prioritization method using a Pareto optimal set as a multi-objective evaluation. Here, we first consider short circuit capacity, and then evaluate CO2 emission, transmission losses and construction costs, comprehensively. Finally, we carry out simulations for the IEEJ EAST 30 machine system, and determine the transmission planning priority, to demonstrate the validity of the proposed method.
本文言語 | English |
---|---|
ホスト出版物のタイトル | 2009 IEEE Power and Energy Society General Meeting, PES '09 |
DOI | |
出版ステータス | Published - 2009 |
イベント | 2009 IEEE Power and Energy Society General Meeting, PES '09 - Calgary, AB 継続期間: 2009 7月 26 → 2009 7月 30 |
Other
Other | 2009 IEEE Power and Energy Society General Meeting, PES '09 |
---|---|
City | Calgary, AB |
Period | 09/7/26 → 09/7/30 |
ASJC Scopus subject areas
- エネルギー工学および電力技術
- 電子工学および電気工学