Application of 'casting support tunneling system using TBM' to unconsolidated soil with high groundwater level

Hiroomi Iida*, Takashi Kitagawa, Keizo Chishiro, Takatoshi Ono, Yukinori Koyama, Atsushi Koizumi

*この研究の対応する著者

    研究成果: Conference contribution

    1 被引用数 (Scopus)

    抄録

    The Sambongihara Tunnel on the Tohoku Shinkansen Line, located between Hachinohe and Shin-Aomori stations, is a double-track tunnel 4,280 meters long. The geology of this tunneling site mainly consists of alternating layers of unconsolidated sandy soil under high hydraulic pressures and cohesive soil. Excavation of this tunnel began in August 2001 using the NATM from the Shin-Aomori side, but the tunnel face collapsed twice, preventing the tunnel construction from advancing as scheduled. We therefore conducted an in-depth study to develop a new tunneling technique, aimed at improving efficiency and safety of the work. The new tunneling method uses a standard earth and mud pressure shield to maintain face stability and ensure good excavating capability. The technique developed will significantly improve the efficiency and safety of the work. This paper outlines the construction and design of the linings selected for this tunneling practice.

    本文言語English
    ホスト出版物のタイトルUnderground Space Use: Analysis of the Past and Lessons for the Future - Proceedings of the 31st ITA-AITES World Tunnel Congress
    ページ765-771
    ページ数7
    2
    出版ステータスPublished - 2005
    イベント2005 ITA-AITES World Tunnel Congress and 31st General Assembly - Istanbul
    継続期間: 2005 5月 72005 5月 12

    Other

    Other2005 ITA-AITES World Tunnel Congress and 31st General Assembly
    CityIstanbul
    Period05/5/705/5/12

    ASJC Scopus subject areas

    • 土木構造工学
    • 地理、計画および開発

    フィンガープリント

    「Application of 'casting support tunneling system using TBM' to unconsolidated soil with high groundwater level」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル