抄録
A new interior point quadratic programming algorithm which can solve power system optimization problems with significantly less computational efforts is presented. Since the formula of this method have been deduced more generally, it can start from either a feasible (interior point) or an infeasible point (non-interior point). In a study, numerical results have verified that the proposed algorithm possesses enough robustness and needs significantly less solution time.
本文言語 | English |
---|---|
ホスト出版物のタイトル | IEEE Power Industry Computer Applications Conference |
Place of Publication | Piscataway, NJ, United States |
出版社 | IEEE |
ページ | 98-104 |
ページ数 | 7 |
出版ステータス | Published - 1995 |
イベント | Proceedings of the 1995 IEEE Power Industry Computer Application Conference - Salt Lake City, UT, USA 継続期間: 1995 5月 7 → 1995 5月 12 |
Other
Other | Proceedings of the 1995 IEEE Power Industry Computer Application Conference |
---|---|
City | Salt Lake City, UT, USA |
Period | 95/5/7 → 95/5/12 |
ASJC Scopus subject areas
- ハードウェアとアーキテクチャ
- 電子工学および電気工学