PY - 2014/1/1
Y1 - 2014/1/1
N2 - The traditional thermal and nuclear power plants are concentrated geographically. If such new power plants are planned, suitable routes which reach to nearest substations are suggested. The wind turbines in wind power plants, however, are scattered in a vast region. It's challenging to connect them and gather energy. However, there has been a few research of the method connecting wind turbines in a wind plant. In this paper, a planning method which optimizes the installation cost of power lines is developed. The target is an optimal design of power lines 'in' large wind power plants. Specifically, we speculated a situation that installs roughly 50 wind generators (single unit at 3MW) in a vast region. Also, we have taken a consideration to establish an optimal network to reduce the transmission overload when power reaches to the aggregating point. Optimal placement of towers and/or link of wind farms are out of our scope.
AB - The traditional thermal and nuclear power plants are concentrated geographically. If such new power plants are planned, suitable routes which reach to nearest substations are suggested. The wind turbines in wind power plants, however, are scattered in a vast region. It's challenging to connect them and gather energy. However, there has been a few research of the method connecting wind turbines in a wind plant. In this paper, a planning method which optimizes the installation cost of power lines is developed. The target is an optimal design of power lines 'in' large wind power plants. Specifically, we speculated a situation that installs roughly 50 wind generators (single unit at 3MW) in a vast region. Also, we have taken a consideration to establish an optimal network to reduce the transmission overload when power reaches to the aggregating point. Optimal placement of towers and/or link of wind farms are out of our scope.
KW - Graph theory
KW - Power line facility planning
KW - Prim's Algorithm
KW - Transmission problem
KW - Wind generator
UR - http://www.scopus.com/inward/record.url?scp=84901942422&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84901942422&partnerID=8YFLogxK
U2 - 10.1109/ISGT.2014.6816465
DO - 10.1109/ISGT.2014.6816465
M3 - Conference contribution
AN - SCOPUS:84901942422
SN - 9781479936526
T3 - 2014 IEEE PES Innovative Smart Grid Technologies Conference, ISGT 2014
BT - 2014 IEEE PES Innovative Smart Grid Technologies Conference, ISGT 2014
PB - IEEE Computer Society
T2 - 2014 IEEE Power and Energy Society Innovative Smart Grid Technologies Conference, ISGT 2014
Y2 - 19 February 2014 through 22 February 2014
ER -