TY - JOUR
T1 - Current status of high temperature superconducting cable demonstration project
AU - Masuda, Takato
AU - Honjo, Shoichi
PY - 2009
Y1 - 2009
N2 - An HTS cable demonstration project has started in 2007. The cable has 66kV/200MVA capacity and 200-300 m length. It will be installed and operated at Asahi sub-station in Yokohama in 2011. Bismuth-based HTS wires with twisted superconducting filaments are used for the cable to reduce the AC loss. In 2009, a 30 m cable system has been constructed and tested to verify the assembling technologies of the cable, a joint and terminations and their performance. This paper describes the overview and current status of this project.
AB - An HTS cable demonstration project has started in 2007. The cable has 66kV/200MVA capacity and 200-300 m length. It will be installed and operated at Asahi sub-station in Yokohama in 2011. Bismuth-based HTS wires with twisted superconducting filaments are used for the cable to reduce the AC loss. In 2009, a 30 m cable system has been constructed and tested to verify the assembling technologies of the cable, a joint and terminations and their performance. This paper describes the overview and current status of this project.
KW - AC loss
KW - Demonstration test in power grid
KW - High temperature superconducting cable
KW - Short-circuit current
UR - http://www.scopus.com/inward/record.url?scp=72849110295&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=72849110295&partnerID=8YFLogxK
U2 - 10.1541/ieejpes.129.1282
DO - 10.1541/ieejpes.129.1282
M3 - Review article
AN - SCOPUS:72849110295
SN - 0385-4213
VL - 129
SP - 1282
EP - 1285
JO - IEEJ Transactions on Power and Energy
JF - IEEJ Transactions on Power and Energy
IS - 11
ER -