抄録
As a response to economic growth, electric power utilities installed many electric power facilities to meet power demand. However, these facilities have aged and should be replaced in the near future. Moreover, after the Great East Japan Earthquake, significant power flow changes in power system would likely to happen. Therefore, for electric power facilities planning, it is necessary to solve such power flow problems. In this paper, we assume a protracted loss of generation capabilities in a nuclear power plant and examine the resulting load changes. We propose the use of series capacitors on non-heavily loaded lines to alleviate load differences among transmission lines. We also propose the concept of mitigation flow sensitivity (MFS). By installing series capacitors at effective locations and determining compensation amounts by prioritizing the MFS, we can solve the power flow problems. We carry out simulations to confirm the validity of the proposed method.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Proceedings of the 2015 IEEE Innovative Smart Grid Technologies - Asia, ISGT ASIA 2015 |
出版社 | Institute of Electrical and Electronics Engineers Inc. |
ISBN(印刷版) | 9781509012381 |
DOI | |
出版ステータス | Published - 2016 1月 19 |
イベント | IEEE Innovative Smart Grid Technologies - Asia, ISGT ASIA 2015 - Bangkok, Thailand 継続期間: 2015 11月 3 → 2015 11月 6 |
Other
Other | IEEE Innovative Smart Grid Technologies - Asia, ISGT ASIA 2015 |
---|---|
国/地域 | Thailand |
City | Bangkok |
Period | 15/11/3 → 15/11/6 |
ASJC Scopus subject areas
- エネルギー工学および電力技術
- 制御およびシステム工学