Ground behaviour due to advancement of steel pipes of the pipe lining tunnel work

Yasuharu Okabe, Kazuhito Komiya, Hiroki Takahashi, Hirokazu Akagi

研究成果: Conference contribution

抄録

Three dimensional ground displacements during the pile lining construction work were measured in the field in order to investigate the effect of the construction processes on the ground responses. In the pile lining method, a steel pile is driven forward by applying mechanical jack forces and excavating the soil in front of the pile. The ground displacement was mainly caused by these pile lining operations. Three dimensional FEM analyses were conducted to simulate the processes of the pile lining construction work and the numerical results were compared with the field measurements.

本文言語English
ホスト出版物のタイトル5th China-Japan Geotechnical Symposium
出版社People's Communications Press
ページ17-21
ページ数5
ISBN(印刷版)9787114105821
出版ステータスPublished - 2013 1月 1
イベント5th China-Japan Geotechnical Symposium: New Advances in Geotechnical Engineering - Chengdu, China
継続期間: 2013 5月 182013 5月 19

出版物シリーズ

名前5th China-Japan Geotechnical Symposium

Conference

Conference5th China-Japan Geotechnical Symposium: New Advances in Geotechnical Engineering
国/地域China
CityChengdu
Period13/5/1813/5/19

ASJC Scopus subject areas

  • 地盤工学および土木地質学

フィンガープリント

「Ground behaviour due to advancement of steel pipes of the pipe lining tunnel work」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル