抄録
Process planning and scheduling are important manufacturing planning activities which deal with resource utilization and time span of the manufacturing operations. The process plans and the schedules generated in the planning phase shall be modified in the execution phase due to the disturbances in the manufacturing systems. This paper deals with a multi-agent architecture of an integrated and dynamic system for process planning and scheduling for multi jobs. Systematic methods are proposed to generate the process plans and the schedules of the manufacturing resources and the individual jobs, dynamically and incrementally. A simulation software has been prepared to carry out case studies, aimed at verifying the performance of the proposed multi-agent architecture.
本文言語 | English |
---|---|
出版ステータス | Published - 2007 12月 1 |
外部発表 | はい |
イベント | 4th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2007 - Fukuoka, Japan 継続期間: 2007 11月 7 → 2007 11月 9 |
Other
Other | 4th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2007 |
---|---|
国/地域 | Japan |
City | Fukuoka |
Period | 07/11/7 → 07/11/9 |
ASJC Scopus subject areas
- 産業および生産工学