Japanese energy management in smart grid after the Great East Japan Earthquake

Yasuhiro Hayashi*

*この研究の対応する著者

研究成果: Review article査読

14 被引用数 (Scopus)

抄録

The Great East Japan Earthquake drastically changed Japanese energy management scheme in Japanese electrical grid. Stopped nuclear power plants caused a rise of the electricity costs. Demand side energy management scheme such as demand response is newly needed to reduce the peak of electric power demand by using HEMS (Home Energy Management System) and BEMS (Building Energy Management System). This paper describes Japanese trend of energy management based on demand response and international standardization of communications protocol and indicate the future issues and vision.

本文言語English
ページ(範囲)225-228
ページ数4
ジャーナルIEEJ Transactions on Power and Energy
133
3
DOI
出版ステータスPublished - 2013

ASJC Scopus subject areas

  • エネルギー工学および電力技術
  • 電子工学および電気工学

フィンガープリント

「Japanese energy management in smart grid after the Great East Japan Earthquake」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル