抄録
In this paper, a probabilistic analysis is proposed for on-site generator maintenance and installation strategy in an industrial plant. The proposed approach considers the cost relating to the maintenance of industrial plant and the avoided risk of the shutdown/outage of industrial plant caused by failure in onsite generator under multi-generator installed conditions. With the proposed approach, owner of industrial plant can make a decision how much capacity onsite generator to have. Demonstration of the validity of the proposed approach using a simplified industrial plant model is performed.
本文言語 | English |
---|---|
ホスト出版物のタイトル | 2010 International Conference on Power System Technology: Technological Innovations Making Power Grid Smarter, POWERCON2010 |
DOI | |
出版ステータス | Published - 2010 |
イベント | 2010 International Conference on Power System Technology: Technological Innovations Making Power Grid Smarter, POWERCON2010 - Hangzhou 継続期間: 2010 10月 24 → 2010 10月 28 |
Other
Other | 2010 International Conference on Power System Technology: Technological Innovations Making Power Grid Smarter, POWERCON2010 |
---|---|
City | Hangzhou |
Period | 10/10/24 → 10/10/28 |
ASJC Scopus subject areas
- エネルギー工学および電力技術
- 燃料技術