Optimal replacement scheduling of obsolete substation equipment by branch & bound method

Hideaki Tanaka*, H. Magori, T. Niimura, R. Yokoyama

*この研究の対応する著者

研究成果: Conference contribution

6 被引用数 (Scopus)

抄録

In this paper, the authors propose an algorithm using branch and bound method to search an optimal replacement scheduling of obsolete equipment in aged primary substations. The developed tool can efficiently find an optimal solution from huge combinations of replacement schedules. The objective function to be minimized is the net present value of the sum of operation and maintenance cost, replacement cost, and the reliability cost in case of CB failure for each substation during the specified time frame. To solve this problem under the constraints such as annual budget ceiling, number of replacement targets per annum, and replacement time frame for each substation, we apply the branch and bound method, which is well known as an efficient combinatorial optimization technique. The proposed algorithm is demonstrated using a small scale model (2 substations, 4-year time frame) to verify its effectiveness.

本文言語English
ホスト出版物のタイトルIEEE PES General Meeting, PES 2010
DOI
出版ステータスPublished - 2010
イベントIEEE PES General Meeting, PES 2010 - Minneapolis, MN
継続期間: 2010 7月 252010 7月 29

Other

OtherIEEE PES General Meeting, PES 2010
CityMinneapolis, MN
Period10/7/2510/7/29

ASJC Scopus subject areas

  • エネルギー工学および電力技術

フィンガープリント

「Optimal replacement scheduling of obsolete substation equipment by branch & bound method」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

引用スタイル