抄録
In this paper, we address the problem of timing-constrained scheduling with resources operating at multiple voltages. Without the resource concern, a dual piecewise-linear programming formulation is proposed which can be transformed into a min-cost flow problem on a simplified flow graph. We present a two-stage method to minimize power and resource usage. In the first stage, an optimal dual piecewise-linear network simplex method (DPLNSM) is proposed to minimize the power consumption. The method is efficient, especially when the given maximum control step is large. In the second stage, a tabu-search based scheduling method is proposed to decrease the resource usage on the basis of power optimization, where tree transformation and list scheduling are done in each iteration. Experimental results show that our proposed method generates optimal solutions on the given benchmarks in a short time.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Proceedings of International Conference on ASIC |
出版社 | IEEE Computer Society |
ISBN(印刷版) | 9781467364157 |
DOI | |
出版ステータス | Published - 2013 |
イベント | 2013 IEEE 10th International Conference on ASIC, ASICON 2013 - Shenzhen 継続期間: 2013 10月 28 → 2013 10月 31 |
Other
Other | 2013 IEEE 10th International Conference on ASIC, ASICON 2013 |
---|---|
City | Shenzhen |
Period | 13/10/28 → 13/10/31 |
ASJC Scopus subject areas
- ハードウェアとアーキテクチャ
- 電子工学および電気工学