T1 - Service restoration method considering simultaneous disconnection of distributed generators by one-bank fault of distribution system
AU - Takano, Hirotaka
AU - Hayashi, Yasuhiro
AU - Matsuki, Junya
AU - Kobayashi, Naoki
PY - 2008
Y1 - 2008
N2 - Distributed generators (DGs) such as fuel cells and solar cells are going to be installed in the demand side of distribution systems. The DGs can reduce distribution loss by appropriate allocation. However, there are several problems installing DGs such as service restoration of distribution system with DGs and so on. When one bank fault of distribution substation occurs in distribution system, since DGs are simultaneously disconnected from the system, it is not easy to restore isolated load by one bank switching in distribution substation. Therefore, a service restoration method to determine restoration configuration and restoration procedures (switching procedure from normal configuration to restoration configuration) taking into account simultaneous disconnection of DGs is needed. In this paper, the authors propose a computation method to determine the optimal restoration configuration and the restoration procedure considering simultaneous disconnection of DGs by one bank fault of distribution system. In the proposed algorithm, after all of the restoration configuration candidates are effectively enumerated under the operational constraints, the optimal configuration to restore the isolated load is selected among enumerated configuration candidates. After determining the optimal restoration configuration, the optimal restoration procedures are obtained by greedy algorithm. Numerical simulations are carried out for a real scale system model with 237 sectionalizing switches (configuration candidates are 2237) and 21 DGs (total output is 5250 kW which is 3% of total load) in order to examine the validity of the proposed algorithm.
AB - Distributed generators (DGs) such as fuel cells and solar cells are going to be installed in the demand side of distribution systems. The DGs can reduce distribution loss by appropriate allocation. However, there are several problems installing DGs such as service restoration of distribution system with DGs and so on. When one bank fault of distribution substation occurs in distribution system, since DGs are simultaneously disconnected from the system, it is not easy to restore isolated load by one bank switching in distribution substation. Therefore, a service restoration method to determine restoration configuration and restoration procedures (switching procedure from normal configuration to restoration configuration) taking into account simultaneous disconnection of DGs is needed. In this paper, the authors propose a computation method to determine the optimal restoration configuration and the restoration procedure considering simultaneous disconnection of DGs by one bank fault of distribution system. In the proposed algorithm, after all of the restoration configuration candidates are effectively enumerated under the operational constraints, the optimal configuration to restore the isolated load is selected among enumerated configuration candidates. After determining the optimal restoration configuration, the optimal restoration procedures are obtained by greedy algorithm. Numerical simulations are carried out for a real scale system model with 237 sectionalizing switches (configuration candidates are 2237) and 21 DGs (total output is 5250 kW which is 3% of total load) in order to examine the validity of the proposed algorithm.
KW - Distributed generator
KW - Distribution system
KW - Enumeration method
KW - Greedy algorithm
KW - Onebank fault
KW - Restoration configuration
KW - Restoration procedure
KW - Service restoration
KW - Simultaneous disconnection
UR - http://www.scopus.com/inward/record.url?scp=62249192772&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=62249192772&partnerID=8YFLogxK
U2 - 10.1002/ecj.10133
DO - 10.1002/ecj.10133
M3 - Article
AN - SCOPUS:62249192772
SN - 8756-663X
VL - 91
SP - 44
EP - 55
JO - Electronics and Communications in Japan, Part II: Electronics (English translation of Denshi Tsushin Gakkai Ronbunshi)
JF - Electronics and Communications in Japan, Part II: Electronics (English translation of Denshi Tsushin Gakkai Ronbunshi)
IS - 8
ER -