Shunt capacitor renewal planning through cost leveling strategy using condition age model

Yuta Tanaka, Ken Suzuki, Shinichi Iwamoto

    研究成果: Conference contribution

    抄録

    Past high economic growth in Japan sharply increased power demands year after year. Japanese utilities therefore installed shunt capacitors (SCs) to help voltage profiles and stability meet predicted demands, but some aging SCs will soon need to be replaced. Recent large-scale introduction of Photo Voltaic (PV) systems may lead to voltage stability problems, and there are SC renewal planning problem. This paper addresses the issue of SC replacement with other voltage control equipment. In addition, economic evaluation techniques have caught the interest of power system asset managers. We propose a new fundamental renewal planning method with renewal period cost leveling using the condition age model. Simulations of the IEEJ 30-machine 115-bus system confirm the validity of the proposed method.

    本文言語English
    ホスト出版物のタイトル10th International Power and Energy Conference, IPEC 2012
    ページ263-268
    ページ数6
    DOI
    出版ステータスPublished - 2012
    イベント10th International Power and Energy Conference, IPEC 2012 - Ho Chi Minh City
    継続期間: 2012 12月 122012 12月 13

    Other

    Other10th International Power and Energy Conference, IPEC 2012
    CityHo Chi Minh City
    Period12/12/1212/12/13

    ASJC Scopus subject areas

    • エネルギー工学および電力技術
    • 燃料技術

    フィンガープリント

    「Shunt capacitor renewal planning through cost leveling strategy using condition age model」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル