Shunt capacitor renewal planning with a cost leveling strategy using the condition age model

Yuta Tanaka*, Ken Suzuki, Shinnichi Iwamoto

*この研究の対応する著者

    研究成果: Article査読

    抄録

    With the past high economic growth period in Japan, the power demand has been increasing sharply year by year. Therefore, the Japanese utilities have installed many Shunt Capacitors (SCs) along with the predicted demand in order to keep the voltage profile and stability. Meanwhile, some SCs have aged because they have been used for a long time, and thus, have to be replaced sometime soon. Recently, the usage of the concept of asset managements has been paid attention as economic evaluation techniques in the power system. Therefore we propose a new renewal planning method with cost leveling during the renewal period using the condition age model.

    本文言語English
    ジャーナルIEEJ Transactions on Power and Energy
    131
    9
    DOI
    出版ステータスPublished - 2011

    ASJC Scopus subject areas

    • 電子工学および電気工学
    • エネルギー工学および電力技術

    フィンガープリント

    「Shunt capacitor renewal planning with a cost leveling strategy using the condition age model」の研究トピックを掘り下げます。これらがまとまってユニークなフィンガープリントを構成します。

    引用スタイル