抄録
Real-time scheduling processes based on the utility values have been proposed and applied to the Holonic Manufacturing Systems (HMS), in the previous papers. A simulation based procedure has also been implemented to estimate the future status of HMS and to determine the utility values aiming at improving scheduling method. However, it was assumed that only one holon in the HMS carries out the estimation for the ease of the estimation process. A simulation based real-time scheduling method is newly proposed, in the paper, to improve the estimation process which enable all the holons to estimate the future status of the HMS.
本文言語 | English |
---|---|
出版ステータス | Published - 2007 |
外部発表 | はい |
イベント | 4th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2007 - Fukuoka, Japan 継続期間: 2007 11月 7 → 2007 11月 9 |
Other
Other | 4th International Conference on Leading Edge Manufacturing in 21st Century, LEM 2007 |
---|---|
国/地域 | Japan |
City | Fukuoka |
Period | 07/11/7 → 07/11/9 |
ASJC Scopus subject areas
- 産業および生産工学