TY - GEN
T1 - Spiral-evolutional production scheduling system
AU - Fujimura, Shigeru
AU - Weng, Wei
PY - 2016/1/18
Y1 - 2016/1/18
N2 - Although many production scheduling systems are developed, it is difficult to introduce for medium-sized enterprises, because of high cost of initial and maintenance investment. However functions provided by it, such as available-to-promise under the restrictions of the own process, resource leveling and so on, are required by all of enterprises to make their profits. To realize a scheduling system, which can be introduced more easily for the small and medium-sized enterprises, a novel spiral-evolutional scheduling system is proposed in this paper. This system is getting started with gathering of production information in factories, and through progress monitoring a scheduling function is installed and evolved in a spiral evolutional systemizing process. In this paper, the concept of the spiral-evolutional production scheduling system is described, and the implementation of this system and the merit of introduction of it are shown.
AB - Although many production scheduling systems are developed, it is difficult to introduce for medium-sized enterprises, because of high cost of initial and maintenance investment. However functions provided by it, such as available-to-promise under the restrictions of the own process, resource leveling and so on, are required by all of enterprises to make their profits. To realize a scheduling system, which can be introduced more easily for the small and medium-sized enterprises, a novel spiral-evolutional scheduling system is proposed in this paper. This system is getting started with gathering of production information in factories, and through progress monitoring a scheduling function is installed and evolved in a spiral evolutional systemizing process. In this paper, the concept of the spiral-evolutional production scheduling system is described, and the implementation of this system and the merit of introduction of it are shown.
KW - Production Management
KW - Production Scheduling
KW - Progress Monitoring
KW - Spiral-Evolutional
UR - http://www.scopus.com/inward/record.url?scp=84962038057&partnerID=8YFLogxK
UR - http://www.scopus.com/inward/citedby.url?scp=84962038057&partnerID=8YFLogxK
U2 - 10.1109/IEEM.2015.7385886
DO - 10.1109/IEEM.2015.7385886
M3 - Conference contribution
AN - SCOPUS:84962038057
T3 - IEEE International Conference on Industrial Engineering and Engineering Management
SP - 1442
EP - 1446
BT - IEEM 2015 - 2015 IEEE International Conference on Industrial Engineering and Engineering Management
PB - IEEE Computer Society
T2 - IEEE International Conference on Industrial Engineering and Engineering Management, IEEM 2015
Y2 - 6 December 2015 through 9 December 2015
ER -