抄録
Presently, a tunnel sustaining the outer load and the load caused by inner water pressure with a primary lining made up of segments is usually selected for a large-scale underground shield tunnel project. The Advanced Construction Technology Center, commissioned by the Ministry of Construction and others, has been studying problems related to design methods and the planning of such projects for a few years. Here is an outline of the conclusions we have reached on segment structure and design methods.
本文言語 | English |
---|---|
ホスト出版物のタイトル | Challenges for the 21st Century. Proceedings of the World Tunnel Congress '99, Oslo, June 1999. (2 vols). |
編集者 | T. Alten, L. Backer, P. Bollingmo, E. Broch, K. Holmoy, K.G. Holter, K. Nielsen, T. Alten, L. Backer, P. Bollingmo, E. Broch, K. Holmoy, K.G. Holter, K. Nielsen |
出版社 | A.A.Balkema |
ページ | 747-754 |
ページ数 | 8 |
ISBN(印刷版) | 9058090639 |
出版ステータス | Published - 1999 |
外部発表 | はい |
イベント | Proceedings of the World Tunnel Congress '99. Challenges for the 21st Century. - Oslo 継続期間: 2099 5月 31 → 2099 6月 3 |
Other
Other | Proceedings of the World Tunnel Congress '99. Challenges for the 21st Century. |
---|---|
City | Oslo |
Period | 99/5/31 → 99/6/3 |
ASJC Scopus subject areas
- 地球惑星科学(全般)
- 環境科学(全般)