抄録
The conventional risk management based on dealing with the incidents occurred in the past mainly focuses on preventing the similar incidents against the past incidents. In the meantime, it is true that there are a lot of comments saying 'beyond the scope of the assumption' or 'unknown accident we've never seen before' after the incidents occurred. Therefore, in this paper, we propose 'Risk Creative Approach (RCA)' to prevent risks after creating the risk generating mechanism based on the way of realizing risks intentionally, which comes from 'Sabotage Analysis (SA)' benefitting from game theory's standpoint. We introduced RCA to the proposed plan(we already considered) regarding 'Backup System (BUS) 'of 'Expressway Traffic Control System (ETCS)' at Metropolitan Expressway Company(MEX) and tried to analyze and verify it. In consequence, we reaped the viable risk countermeasures including proposed measures against tsunami. Proposed countermeasures were proposed before 'The great eastern Japan earthquake on 11th of March 2011'. And we conducted a review of previous plan by applying proposed risk countermeasures. What this case example makes clear is that we confirmed the effectiveness of RCA (proposed method).
本文言語 | English |
---|---|
ホスト出版物のタイトル | PICMET 2014 - Portland International Center for Management of Engineering and Technology, Proceedings: Infrastructure and Service Integration |
出版社 | Institute of Electrical and Electronics Engineers Inc. |
ページ | 3430-3440 |
ページ数 | 11 |
ISBN(印刷版) | 9781890843304 |
出版ステータス | Published - 2014 10月 10 |
イベント | 2014 Portland International Center for Management of Engineering and Technology, PICMET 2014 - Kanazawa, Japan 継続期間: 2014 7月 27 → 2014 7月 31 |
Other
Other | 2014 Portland International Center for Management of Engineering and Technology, PICMET 2014 |
---|---|
国/地域 | Japan |
City | Kanazawa |
Period | 14/7/27 → 14/7/31 |
ASJC Scopus subject areas
- 技術マネージメントおよび技術革新管理
- 戦略と経営
- 輸送